0 County Road 17 Hwy — Buyer Dossier
Team Steven Levac — Royal LePage Performance Realty, Brokerage Royal LePage Performance Realty, Brokerage — Independently Owned & Operated

Buyer Dossier · Vacant Highway Commercial Land

0 County Road 17 Hwy

Listed as 1861 Highway 34, Township of Champlain, ON K6A 2R2 · MLS® X12896828 · County Road 17 is Highway 34 — the former provincial highway at the southern gateway entrance to Hawkesbury.

$10,400,000 CAD

HST is in addition to the purchase price. ≈ $104,730 per acre over 99.3 acres (lot size source: MPAC).

99.3 ac
Total land, 2 parcels
CH-h / CH-5
Zoning (By-law 2000-75)
17,100
Vehicles / day, Hwy 34 (2021)
$53,486
Property taxes (2025)
214
Days on market
None
Water · sewer · utilities on site
01

Why This Property

  • 99.3 acres at the gateway entrance to Hawkesbury — the highest-exposure commercial position on the town’s southern approach, on the Highway 34 corridor with about 17,100 vehicles passing every day (2021 MTO data, up from 10,500 in 1990 — steady growth).
  • Genuinely broad Highway Commercial zoning: retail, restaurant, grocery, hotel/motel, gas station, auto sales & service, offices, garden centre, personal services, wholesale and more — permitted as-of-right (By-law 2000-75, s.6.2(a)).
  • Two parcels / two roll numbers — develop in phases, sell a parcel separately, or bring in a joint-venture partner. Rare flexibility at this scale.
  • No Township development charges, and building permits typically issue in 1–3 weeks.
  • Ottawa–Montreal corridor: ~110 km to Ottawa, ~90–100 km to Montreal, with Highway 417 Exit 27 just 10–15 km south.
  • Every vehicle entering Hawkesbury from the south — including all Highway 417 traffic bound for town — passes this frontage.

Your development roadmap — what comes next

  • Step 1 — Lift the holding provision. The “-h” is removed through the Township’s standard process (Council-passed amendment with supporting reports). Your planning team handles this as the first step — start the conversation with Township Planning early.
  • Step 2 — Servicing strategy. Municipal water is available for extension along Highway 34; private septic is permitted through South Nation Conservation (one window for environmental + servicing review).
  • Step 3 — Site plan. Commercial site plan approval with the Township, then building permit. The Township charges no development charges.
  • The CH-5 parcel is tailored for highway uses — auto service, gas, restaurant, retail, vehicle sales — and uniquely adds fuel storage.
  • Direct county-road frontage: commercial entrance permit through the United Counties ($200 + $1,500 refundable deposit).
02

Buyer questions, answered straight

Can I build a hotel, a gas station, a grocery store?

On the base CH parcel, yes — all three are permitted as-of-right under s.6.2(a): “tourist lodging establishment” (the by-law’s term covering hotel/motel), automobile gas station / service station, and food or grocery store — after the holding provision is lifted.

On the CH-5 parcel, no hotel and no grocery: CH-5 permits only auto service station, catering, commercial garage, farm service business, fuel storage, garden centre, restaurant, retail store, vehicle sales/service/storage, a veterinary establishment, and an accessory dwelling.

What exactly has to happen before anything can be built?

Three gates, in order: (1) Council lifts the “-h” holding provision by by-law amendment, supported by whatever reports and/or servicing agreement Council requires; (2) Site Plan Control approval under Planning Act s.41, with a registered Site Plan Agreement — expect a servicing study, grading/drainage and landscape plans, a Transportation Impact Assessment, and likely Phase 1/2 environmental site assessment and geotechnical work; (3) building permit — the Township typically issues permits 1–2 weeks after a complete submission (about 3 weeks in summer peak). Pre-consultation with Township Planning is recommended before starting.

How do I service it? There’s no water or sewer.

Sewer: municipal sewer exists only in L’Orignal and Vankleek Hill — any development here is on private sewage, permitted through South Nation Conservation. The key threshold: design flows over 4,500 L/day require a servicing options report and hydrogeological report at site-plan stage; systems up to 10,000 L/day fall under the Ontario Building Code, and over 10,000 L/day needs a Ministry of the Environment (MECP) Environmental Compliance Approval — a much longer, costlier path. A restaurant, hotel, or grocery can exceed these thresholds easily, so a phased servicing strategy matters.

Water: the Township states water connection is available “on demand” along Highway 34 where the Hawkesbury-fed transmission main is installed — but the listing shows no water on site, so the buyer faces extension/connection costs and a capacity confirmation, not a hard “no.” A commercial-scale well may need an MECP Permit to Take Water depending on volumes.

Hydro: Hydro One territory. A new commercial service requires an application; the customer pays a capital contribution where forecast revenues don’t cover Hydro One’s connection investment, plus easements and on-property works. Three-phase capacity and distance to existing plant drive the cost — get a Hydro One feasibility estimate early.

Can I get a commercial driveway onto County Road 17?

Yes, by permit. CR 17 is a United Counties road; entrances are governed by UCPR Entrance By-law 2021-19. Rules: maximum one entrance per property unless the Director approves a secondary one; direct access can be denied where alternate access exists; the entrance must meet Schedule “B” sightline and spacing minimums; a standard commercial entrance is 9 m maximum width with a 9 m radius; the owner pays 100% of culvert purchase and installation. Fee: $200 non-refundable permit fee + $1,500 refundable security deposit. At ~17,000 vehicles/day, expect the Counties to require a Traffic Impact Study and possibly turning-lane or shoulder upgrades at the developer’s expense.

Can I buy just one parcel, or split it further later?

The offering spans two separate parcels with their own PINs/roll numbers, so each can be conveyed separately without a severance — that supports phased development, separate financing, or a later sale of one parcel. Any further division needs a Planning Act s.53 consent (conditions must be satisfied within 2 years or the consent lapses), and if many lots are contemplated, the approval authority (the United Counties, which handles subdivisions in Champlain) can require a full plan of subdivision instead. Merging the two parcels into one PIN is possible but rarely advantageous — keeping them separate preserves optionality.

What will development cost me in municipal fees?

The Township of Champlain levies no development charges — its building page states it “does not have any development charge in addition to the building permit fee.” Two items could not be verified and should be confirmed: whether the United Counties levies a separate county-wide development charge, and whether Champlain has a parkland dedication by-law in force (Planning Act s.42 caps commercial/industrial parkland conveyance at 2% of land or cash-in-lieu). The applicant also pays all legal, engineering, and peer-review costs for site plan approval, plus any United Counties review fees.

What happens to the $53,486 tax bill after I develop?

The land is MPAC property code 105, “Vacant commercial land,” taxed in the commercial class. Once development proceeds, MPAC issues supplementary/omitted assessments on “change events” — improvements or a classification change (for example, losing vacant-land subclass status) where value rises by 5% or $10,000 or more. Budget for a step-up in assessed value and taxes as buildings are completed and occupied; the current assessment reflects vacant-land valuation, not the $10.4M asking price.

Any environmental red flags — wetlands, floodplain?

The conservation authority is South Nation Conservation (SNC). An SNC permit is required for development in river/stream valleys, wetlands, floodplain, and hazardous lands. No mapped wetland, floodplain, ANSI, or watercourse on these two parcels could be verified from public sources — this must be checked on SNC’s Public Geoportal (“Find Your Property”), through SNC’s Property Inquiry Service for purchasers, and on the county’s Prescott-Russell à la Carte GIS zoning and natural-heritage layers. Also watch for the by-law’s “wf” unstable-slope overlay (geotechnical setbacks) and separation distances from waste or industrial uses. Conveniently, SNC is also the septic-system permitting authority — one window for both environmental and servicing review.

Is $10.4 million a fair price?

At ≈$104,730/acre, the per-acre positioning is comparable to the only nearby vacant-land asking price found — 5.2 acres in East Hawkesbury (St-Eugène) at $599,000, ≈$115,000/acre — for a parcel nearly 20× larger. Large highway-commercial assemblies of this size rarely trade publicly in Prescott-Russell, and 99.3 contiguous highway-commercial acres at a town gateway is genuinely rare in this township.

03

Location & access

The lot sits on Highway 34 (County Road 17) on the right as you enter Hawkesbury — the town’s southern gateway. Directions: from Highway 417 toward Vankleek Hill, then toward Hawkesbury.

Highway 34 south of town is the established commercial strip — Canadian Tire, dealerships, and highway services cluster along it. The Town of Hawkesbury’s draft Official Plan explicitly encourages new retail/commercial development, and a $20M+ retail expansion (Harden’s Plaza Hawkesbury Phase III) has been reported as a confidence signal in the local market — a lower-authority source, so verify independently.

DestinationDistanceDrive
Hawkesbury town centre (Main St)~5–8 kmMinutes
Highway 417 — Exit 27 (Hwy 34)~10–15 km—
Ottawa~110 km~1 h – 1 h 30
Montreal (via A-40)~90–100 km~1 h

Distances are approximate, drawn from the listing and public distance sources listed in Sources. Highway 417 Exit 9 (County Road 17) serves the east side of Hawkesbury; 417 continues east as Autoroute 40 to Montreal.

04

Zoning — By-law 2000-75

The land is zoned CH-h (Highway Commercial with holding provision) and CH-5 (a site-specific Highway Commercial exception) under the Township of Champlain Zoning By-law 2000-75. Which acres carry which zone — and whether the CH-h/CH-5 boundary follows the parcel lines — must be confirmed on the zoning schedule and county GIS.

Base CH zone — permitted uses as-of-right (s.6.2(a))

Once the holding provision is lifted, the base CH zone is genuinely broad. The full list from the by-law:

Retail storeRestaurantFood / grocery storeTourist lodging (hotel / motel)Automobile gas stationAutomobile service stationAuto body / repair shopAutomobile salesCar washAutomotive storeBusiness / professional officeMedical & dental officePersonal service shopGarden centreNurseryBuilding supply centreWholesale establishmentWarehouse (accessory only)Catering establishmentCommercial garageVehicle sales, service & storageCommercial vehicle / heavy equipment sales & serviceFarm equipment sales & serviceFarmer’s marketFuneral homeAnimal hospital / veterinaryPet shopAmusement parkCommercial clubDriver training establishmentBuilding contractor shop & yardContractor / tradesperson establishmentCustom workshopFood productionPrinting / publishingPropane cylinder handlingResearch & development centreRental establishmentService & repair shopCommercial parking lotOutdoor recreational facilityStormwater management facilityAccessory dwelling

Direct answers: retail ✓ · restaurant ✓ · hotel/motel ✓ (as “tourist lodging establishment”) · gas station ✓ · office ✓ · light industrial ✗ as a principal use — a warehouse is permitted only as accessory to a permitted use; true industrial uses belong in the ML/MG zones.

Auto service stations and garages must also meet the special provisions of s.3.23. Open storage is allowed in CH but only accessory to the principal use, screened by a 2 m opaque fence with a 3 m landscaped strip (s.3.28).

Zone standards (s.6.2(b)) — piped vs. private services

Because this site has no piped services, the Private services column is the one that governs any development here.

RequirementPiped servicesPrivate services
Minimum lot arean/a8,000 m²
Minimum lot frontage15 m45 m
Minimum front / rear / exterior side yards6 m9 m
Minimum interior side yard3 m6 m
Maximum building height12 m12 m
Maximum lot coverage40%30%

Where CH abuts a Residential or Institutional zone (s.6.6(c)): rear yard 9 m (piped) / 12 m (private); interior side yard 6 m (piped) / 9 m (private). Under s.4.9, if one lot falls in two zones, each portion follows its own zone’s rules — a zone boundary is not a lot line.

CH-5 — the site-specific exception parcel (s.6.2(c)(v)) Narrower than base CH

The CH-5 exception, tied in the by-law text to Lot 3, Concession 1, West Hawkesbury, permits only:

Automobile service stationCatering establishmentCommercial garageFarm service businessFuel storageGarden centreRestaurantRetail storeVehicle sales, service & storageVeterinary establishmentAccessory dwelling

Not permitted on CH-5:

Hotel / tourist lodgingOfficesGrocery storePersonal service shopAmusement parkAuto body shop

CH-5 is a closed, narrower list than base CH — a restriction, not a bonus. The one thing it adds is fuel storage. ⚠ Verify on the zoning schedule / county GIS that the second parcel (PT 1 46R6778) is the land the CH-5 exception maps to — the exception text ties CH-5 to Lot 3, Concession 1, West Hawkesbury, while the legal description references Plan 12. Confirm with Township Planning and get each parcel’s acreage split.

Source: Township of Champlain Zoning By-law 2000-75, office consolidation March 12, 2024 — ss.3.23, 3.28, 4.5, 4.9, 6.2(a)(b)(c), 6.6. Full PDF link in Sources.

05

The two parcels

Legal description
PT LT B E/S McGill St PL 12, PT 1 46R6811 & PT 1 46R6778; Champlain
Known PIN
541630144 (the second parcel’s PIN could not be verified from public sources — confirm by title search)
Total area
99.3 acres, irregular lot (lot size source: MPAC). The per-parcel acreage split is not published — confirm with Township Planning.
Zoning split
CH-h and CH-5 across the offering; exact acreage per zone not verified.

What two parcels buy you

  • Phasing: develop the highway-frontage parcel first; hold the rear for a later phase.
  • Separate deals: each parcel has its own PIN/roll number and can be financed or sold separately — no severance needed to convey one without the other.
  • Assembly value: 99.3 contiguous acres on a highway corridor is rare in this township; the combined holding is worth more than the sum of scattered lots.

Consent & division rules

  • Selling, mortgaging, or granting >21-year interests in part of a parcel needs a Planning Act s.53 consent; conditions must be met within 2 years or it lapses.
  • If many lots are contemplated, the United Counties (the subdivision approval authority in Champlain) can require a full plan of subdivision instead of consents.
  • Merging the two parcels into one PIN is possible but rarely advantageous — separate parcels preserve optionality.

Sources: listing (MLS X12896828); Planning Act ss.42, 53 as summarized in research notes. See Sources.

06

Development approvals & contacts

The approval path

  • Lifting of Holding — a separate Council by-law process (application form rev. Oct 2025). Run it before or alongside site plan. The Township removes holding provisions only upon submission of necessary reports and/or completion of a required subdivision or servicing agreement.
  • Site Plan Control (Planning Act s.41) — commercial development requires site plan approval plus a registered Site Plan Agreement before a building permit. Pre-consultation with Planning is recommended. The applicant pays all legal/engineering/peer-review costs plus any United Counties review fees. No fixed timeline is published; comparable small-town Ontario site plan processes run roughly 3–9 months depending on study completeness and county coordination.
  • Building permits — Township building office, 925 County Road 17, L’Orignal. Permits typically issue 1–2 weeks after a complete submission, about 3 weeks in summer peak.
  • Development charges — the Township levies none. Unverified Whether the United Counties levies a separate county-wide charge — confirm with UCPR Planning.
  • Parkland — Planning Act s.42 caps commercial/industrial dedication at 2% of land or cash-in-lieu where a by-law exists. Unverified Whether Champlain has such a by-law in force — confirm with Planning.

Who to call

Township of Champlain
948 Pleasant Corner Road East, Vankleek Hill ON K0B 1R0
Phone
613-678-3003
Email
info@champlain.ca (no planning-specific email is published)
Town Hall hours
Mon–Thu 8:00 a.m.–4:00 p.m. · Fri 8:00 a.m.–2:00 p.m.
Building office
925 County Road 17, L’Orignal ON K0B 1K0
UCPR Planning & Forestry
59 Court St, P.O. Box 304, L’Orignal ON K0B 1K0 · 613-675-4661
South Nation Conservation
38 Victoria St, Finch ON · 1-877-984-2948 · info@nation.on.ca

Sources: champlain.ca zoning, building, and subdivision pages; Site Plan Control application form (rev. Oct 2025); nation.on.ca. Links in Sources.

07

Servicing — the buyer’s homework

The listing is clear: no water, no sewers, no utilities on site. No published servicing moratorium or constraint specific to this stretch of Highway 34 was found — the constraint is economic (who pays to extend), not a prohibition.

ServiceWhat’s available / required
Municipal sewerOnly in L’Orignal and Vankleek Hill — not available at this site. Development here is on private sewage.
Municipal waterThe Township states connection is available “on demand” along Highway 34 (and County Road 4) where the transmission main from the Town of Hawkesbury is installed. Extension cost, capacity, and frontage works are the buyer’s to confirm and fund.
Private sewagePermitted by South Nation Conservation. Flows >4,500 L/day trigger a servicing options report + hydrogeological report at site-plan stage. Up to 10,000 L/day: Ontario Building Code (SNC permit). >10,000 L/day: MECP Environmental Compliance Approval — longer and costlier. Confirm thresholds for the specific use with MECP/SNC.
Private wellCommercial-scale water taking may require an MECP Permit to Take Water depending on volumes — flag it in the hydrogeological study.
HydroHydro One distribution territory. New commercial service by application; the customer pays a capital contribution where forecast revenues don’t cover Hydro One’s connection investment, plus easements, permits, and on-property works (Hydro One Conditions of Service, May 2026). Three-phase capacity and distance to existing plant drive cost.

Sources: champlain.ca building & renovating page; Township Site Plan Control application form (4,500 L/day threshold); Hydro One Conditions of Service (May 1, 2026). Links in Sources.

08

Road access & traffic

Entrance permit — UCPR By-law 2021-19

  • County Road 17 is a United Counties road — entrances need a UCPR entrance permit.
  • One entrance per property by default; a secondary entrance only with the Director’s approval. Where alternate access exists, direct county-road access can be denied.
  • Standard commercial entrance: 9 m max width, 9 m radius (Counties standard drawing), meeting Schedule “B” sightline/spacing minimums. No entrance where it would create a traffic hazard.
  • Owner pays 100% of culvert purchase and installation.
  • Fees: $200 non-refundable permit fee + $1,500 refundable security deposit per entrance action.
  • Expect a Traffic Impact Study and possibly turning-lane / shoulder upgrades at the developer’s expense.
  • MTO: no involvement expected — the frontage is on a county road, ~10–15 km north of the Highway 417 interchange, outside provincial corridor controls. Confirm only if a phase approaches the 417/34 interchange lands.
Highway 34 at Hawkesbury — annual average daily traffic (AADT)
0 5,000 10,000 15,000 20,000 10,500 12,600 16,400 16,300 17,100 1990 2000 2010 2019 2021 Vehicles per day · MTO count station “34 Hawkesbury” · 2021 summer volume ≈19,700; ≈1,200 trucks/day

Corridor evidence, not a site-specific count. Source: MTO Provincial Highways Traffic Volumes 1988–2019, 2021 (Ontario Legislative Assembly collection).

Sources: UCPR Entrance By-law 2021-19; UCPR Fees & Charges By-law 2023-19, Schedule F; Counties standard entrance drawing. Links in Sources.

09

Market context — price per acre

PropertySizePrice$/acreNote
This listing — 0 County Rd 17 Hwy / 1861 Hwy 34, Champlain99.3 ac$10,400,000$104,730Vacant, CH-h / CH-5, 214 days on market
0 Labrosse St E, Hawkesbury (St-Eugène) — MLS X134798105.2 ac$599,000$115,000Asking price; “residential/commercial/industrial potential.” Small parcels normally price higher per acre than large assemblies.
Clarence-Rockland commercial/industrial3.54 ac$4,900,000~$1.38MIncludes a 22,278 sq ft building — context only, not comparable to vacant land.
1301 Spence Ave, Hawkesbury (E2 industrial)3 ac$5,000,000~$1.67MIncludes a building — context only, not comparable to vacant land.

The per-acre picture

At ≈$104,730/acre, this listing’s per-acre positioning is comparable to the only nearby vacant-land ask — 5.2 acres in East Hawkesbury (St-Eugène) at ≈$115,000/acre — for a parcel nearly 20× larger. Large highway-commercial assemblies of this size rarely trade publicly in Prescott-Russell.

Demand drivers: Hawkesbury is the Ottawa–Montreal corridor’s midpoint service centre. The Hwy 34 corridor south of town is the established commercial strip (Canadian Tire, dealerships, highway services). The Town of Hawkesbury’s draft Official Plan explicitly encourages new retail/commercial development, and the reported Harden’s Plaza Phase III expansion ($20M+) signals retailer confidence — verify that one independently before quoting it.

Sources: listing MLS X12896828; thebfteam.ca listing X13479810; research notes on improved-property listings. Links in Sources.

10

Taxes

$53,486
Annual taxes (2025)
~$539
Per acre, per year
$107k–$214k
Carry over a 2–4 yr approval horizon
Code 105
MPAC — vacant commercial land

Vacant commercial land is MPAC property code 105 and is taxed in the commercial class (municipalities may also use the optional “parking lots and vacant land” class; tax ratios for these classes range 0.6–1.1× residential under O. Reg. 121/07). The $53,486 annual bill works out to approximately $539 per acre per year.

On development, MPAC issues supplementary/omitted assessments for “change events” — improvements or a classification change (such as losing vacant/excess-land subclass status) where value rises by 5% or $10,000 or more. Expect assessed value, and therefore taxes, to step up as buildings are completed and occupied. The current assessment reflects vacant-land valuation, not the $10.4M asking price.

Sources: MPAC property codes and supplementary/omitted assessment guidance; O. Reg. 121/07. Links in Sources.

11

Environmental — South Nation Conservation

This part of Champlain sits in the South Nation Conservation (SNC) watershed — one of SNC’s 16 member municipalities. SNC wears two hats here: environmental regulation and septic permitting.

  • Regulated areas: an SNC permit is required for development in river/stream valleys, wetlands, floodplain, and hazardous lands (administered under O. Reg. 170/06; Ontario has since moved conservation authorities to O. Reg. 41/24 — confirm the current regulation with SNC).
  • Not verified: no mapped wetland, floodplain, ANSI, or watercourse on PT 1 46R6811 / PT 1 46R6778 could be confirmed from public sources. Check SNC’s Public Geoportal (“Find Your Property”), SNC’s Property Inquiry Service for purchasers, and the county’s à la Carte GIS natural-heritage layers before firming up any deal.
  • By-law flags: the “wf” unstable-slope overlay (ss.3.38, 4.8 — geotechnical setbacks under Building By-law 2005-84); a 30 m setback from the Ottawa River high-water mark (s.3.38(a) — likely not applicable this far south, but verify any watercourses); separation distances from waste/industrial uses (s.3.37).

Sources: nation.on.ca planning & permitting pages and SNC regulation policies; Township of Champlain Zoning By-law 2000-75, ss.3.37, 3.38, 4.8. Links in Sources.

12

Sources

All sources read October 18, 2026. Figures in CAD.

13

Living Here — Everything Around You

Your municipality: Township of Champlain — garbage & recycling schedules, permits, taxes, recreation programs and council news, all in one place.

Schools

Healthcare

Everyday amenities

Getting around

Highway 417 via Exit 27 (Hwy 34) — about 10 minutes. Roughly 1 h 15 to Ottawa and 1 h 10 to Montreal.

Getting the kids to school

Getting the kids to school: check if the bus stops at your door with the STEO Bus Stop Finder (Student Transportation of Eastern Ontario — serves UCDSB & CDSBEO schools).

Getting the kids to school: French-board busing (CSDCEO & CEPEO) is run by the Consortium de transport scolaire de l’Est (CTSE) — transport details are available through the parent portal at ctse.ca.

14

Your listing team

The Team Steven Levac team photo: four team members standing beneath the Team Steven Levac logo and the Royal LePage Performance Realty logo
Team Steven Levac · Royal LePage Performance Realty, Brokerage — Steven Levac, Broker — Team Leader · 613-677-8284 ·
Alexandra Quester, Realtor · 613-678-0706 · teamstevenlevac.com
Steven Levac, Broker
Team Steven Levac · Royal LePage Performance Realty, Brokerage
Showings & offers
613-677-8284 · teamstevenlevac.com
Property
0 County Road 17 Hwy (1861 Highway 34), Champlain ON · MLS X12896828

Dossier prepared October 18, 2026 from the sources listed above — listing data, the Township of Champlain Zoning By-law 2000-75, Township and United Counties of Prescott-Russell publications, MTO traffic volumes, MPAC, Hydro One, and South Nation Conservation. Zoning, servicing, and approval details are summaries for discussion with buyers; purchasers must verify all information with the Township of Champlain, the United Counties of Prescott-Russell, and their own professional advisors.

Disclaimer

The information on this page was gathered from public sources, municipal documents, and mapping tools to help buyers understand this property. While prepared with care, it may not be 100% accurate or complete, and details can change. All buyers should do their own due diligence and verify zoning, servicing, permits, dimensions, and any other details with the appropriate municipal authorities, professionals, and their own representatives before making an offer. — Team Steven Levac, Royal LePage Performance Realty, Brokerage